Home Owners’ After-Hour Sample Drop-Off “J&H Mobil” Location: 1658 Briscoe Rd. Swan Lake, NY, 12783
Total Coliform & E. coli
Nitrate as Nitrogen
Nitrite
pH
Hardness (Total)
Chloride
Fluoride
Sulfate
Total Dissolved Solids
VOCs with MTBE
Glyphosate (Roundup)
Trihalomethanes
Radon in Potable Water
PFAS / PFOA
Arsenic
Lead
Iron
Manganese
Copper
Antimony
Barium
Beryllium
Cadmium
Chromium
Nickel
Selenium
Thallium
Post-installation evaluation of microbiology, nitrate/nitrite, pH, hardness, chloride, fluoride, sulfate, total dissolved solids, VOCs with MTBE, glyphosate, trihalomethanes, radon, PFAS/PFOA, and a broad metals panel after a whole-house filtration system is installed.
This package provides a broad evaluation of treated water after a whole-house filtration system has been installed. It checks health-related contaminants, mineral chemistry, metals, VOCs, PFAS/PFOA, radon and other key water-quality indicators to help confirm how effectively the installed treatment system is performing.
All test kits include the required sample containers, collection instructions, and prepaid overnight return shipping. Samples should be shipped back to the laboratory (not on Friday, Saturday or Sunday) the same day they are collected using the provided return label to ensure applicable laboratory hold times are met. Standard turnaround is approximately 10 business days from receipt of the samples unless otherwise noted.
Total Coliform & E. coli
Nitrate as Nitrogen
Nitrite
pH
Hardness (Total)
Chloride
Fluoride
Sulfate
Total Dissolved Solids
VOCs with MTBE
Glyphosate (Roundup)
Trihalomethanes
Radon in Potable Water
PFAS / PFOA
Arsenic
Lead
Iron
Manganese
Copper
Antimony
Barium
Beryllium
Cadmium
Chromium
Nickel
Selenium
Thallium
Post-installation evaluation of microbiology, nitrate/nitrite, pH, hardness, chloride, fluoride, sulfate, total dissolved solids, VOCs with MTBE, glyphosate, trihalomethanes, radon, PFAS/PFOA, and a broad metals panel after a whole-house filtration system is installed.
This package provides a broad evaluation of treated water after a whole-house filtration system has been installed. It checks health-related contaminants, mineral chemistry, metals, VOCs, PFAS/PFOA, radon and other key water-quality indicators to help confirm how effectively the installed treatment system is performing.
All test kits include the required sample containers, collection instructions, and prepaid overnight return shipping. Samples should be shipped back to the laboratory (not on Friday, Saturday or Sunday) the same day they are collected using the provided return label to ensure applicable laboratory hold times are met. Standard turnaround is approximately 10 business days from receipt of the samples unless otherwise noted.